Level 3 assessment is merely an admission ticket; the figures for the six outcomes must grow out of the source documents.

The case study call in Guangzhou, closing December 18, isn't a contest of how many words you write — it's about whether you can produce those six numbers from before and after the transformation

The threshold is stated upfront; the difficult parts are hidden in the appendix

Last week, a client in the auto parts business sent me a notice on WeChat and asked: We passed Level 3 in the assessment—can we submit a case?

The notice was issued by the Guangzhou Municipal Bureau of Industry and Information Technology on November 20, calling for 2026 smart factory and digital workshop scenario cases. The conditions are not complicated: a small and medium-sized enterprise in one of the six pilot industries—intelligent connected and new energy vehicle components, industrial machine tools and robots, fashion beauty, custom home furnishings, apparel, and luggage—that has completed digital transformation, achieved a digitalization level assessment of Level 3 (inclusive) or above, and has already built a digital workshop or smart factory. Each enterprise selects one direction and submits one case, and before December 18 sends the stamped version and editable version to the designated email address.

There is no prize money. After selection, there is a compilation release, benchmark study visits, and a special exhibition. Many clients swipe away when they hear “no money”; I think that is precisely what makes it worth taking seriously—it is not another round of applications, but a way to turn the money you spent on renovations and the data you accumulated over the past two years into a single externally verifiable exposure. Whether that exchange can be made depends on how substantively those templates in the attachment are filled in.

I downloaded the three attachments on the same page and read them field by field. The structure of the digital workshop template is: case summary 300 characters, enterprise and workshop introduction 200 characters, specific measures 1,300 characters, application results 400 characters, lessons learned 200 characters. The smart factory template adds a 400-character case background, and the results column changes from six items to seven. Word count is not the key; those few lines in the results column are.

The before-and-after comparison of six items tests whether any trace was left before the renovation

The "Application Results" column in the workshop template lists six rows, and each row must be filled with three values: before transformation, after transformation, and improvement magnitude. Production efficiency or capacity per unit time, product yield or first-pass yield, per capita output value, energy consumption per unit product, number of workers or number of people per shift, plus an "Other" row. The factory template is changed to seven rows, adding annual output value or operating revenue, all-personnel labor productivity, and product R&D cycle, and omitting the separate listing of per capita output value.

To be honest, what really got stuck at the customer site was exactly these six lines.

Production efficiency we take from mrp.workorder: completed quantity of work orders divided by actual labor hours. The premise is that the batch of work orders from before the transformation is still in the system, and that work was actually reported by work order at the time. We encountered a client who, before the transformation, used paper routing sheets, and after going live with Odoo, backfilled half a year of opening data, using the backfilled figures as the "before transformation" baseline—the calculated improvement was 60%, but when the review asked for details, they couldn't answer. Here is an honest reminder: the template does not require you to prove which table the baseline comes from, but the words "detailed data" are written in the requirements, and reviewers can tell which set of numbers was backfilled.

The yield rate is calculated as the qualified quantity of the work order divided by the total input quantity. Many customers did not enable this field when they went live and only recorded the completed quantity. Output value per capita requires aligning the active headcount in hr.employee with the operating revenue in account.move over the same period—note, the same period. We have seen algorithms that divide annual revenue by month-end headcount; the numbers look good but cannot withstand scrutiny. Odoo has no ready-made field for energy consumption per unit product; you have to take timestamped records from a collection gateway or electricity meter ledger. ERP can only handle the denominator (output) half. Take the labor quantity from attendance or payroll, not from an org-chart headcount snapshot—that is authorized headcount, not actual attendance.

Among the seven items in the factory template, "product R&D cycle" is the hardest to provide. It requires two time points, the project initiation date and the mass production date. For most small and medium-sized manufacturing enterprises, these two dates exist only in project group chats and have not entered the system. If they truly do not exist, I suggest truthfully writing "not included in system statistics" rather than padding with an estimated value—this is the weight of the sentence in the notice that "cases should adhere to seeking truth from facts."

Don't submit the pre-sales version for that system architecture diagram.

The smart factory track requires attached before-and-after renovation comparison images, system architecture diagrams, flowcharts, and on-site photos. The workshop track also requires equipment and system screenshots, architecture diagrams, and flowcharts.

We’ve fallen into this pitfall before. When one customer submitted materials, they directly pasted in the architecture diagram we had drawn during the pre-sales stage—the diagram showed a whole bunch of modules such as MES, WMS, BI, and industrial gateways, but only sales, procurement, inventory, and finance were actually deployed; the production module was still in trial. The diagram didn’t match the product, so at the review site, as soon as they asked "which workshop is this MES module running in?", the truth came out.

Architecture diagrams are not automatically generated in Odoo; you have to draw them yourself. Our approach works backward from the list of modules actually enabled: open the Apps list, list the modules that are installed and have a large volume of documents, then mark the data interfaces that actually exist with gateways, inspection devices, and external systems. However many documents you have processed, mark that number on the diagram—this is not formalism; it is a health check report showing exactly how far your two-year transformation has progressed.

On-site photos also have particular requirements. What is required is “actual photos of the workshop site,” not renderings, and not computer screens in the office. Things with a physical environment, such as equipment nameplates, workstation kanban boards, and data collection terminals, can better demonstrate “already built” than a software screenshot.

Three things this week

First, before December 4, review the six pilot industries and confirm which category you belong to; if you are not among these six categories but have indeed made transformations, you do not need to force a fit—this solicitation has an industry scope.

Second, before December 10, export from the system the two point-in-time figures—before and after the renovation—for the six (seven for the factory) effectiveness items, and mark the source document for each item. For any item for which the pre-renovation document cannot be produced, note “baseline not entered in the system” in the table; do not leave it blank.

Third, before submission on December 18, have the implementation consultant check the architecture diagram against the list of installed modules; every module on the diagram should be able to open a real document on the spot. Remove any module that fails the check from the diagram.

关于我们

​我们致力于帮助中小企业实现数字化转型,我们的团队由一群充满激情和创新思维的专业人士组成,他们具备丰富的行业经验和技术专长。

扫一扫获取顾问以及手册

Sign in to leave a comment
The inclusive amount has already been received; for the benchmark step, only the difference needs to be supplemented.
The Zhaoqing benchmark project does not pay out a separate sum of money; it fills the gap between the general-benefit award and subsidy you have already received and the benchmark standard.