Customer asks: We have already received inclusive finance; can we still apply for benchmark?
A manufacturing company in Zhaoqing asked me this question last month. My answer at the time was not accurate enough; today I dug out the original text and reread it, so I need to correct it.
The Notice on Launching the Application for 2026 Zhaoqing City Pilot Benchmark Projects for Digital Transformation of Small and Medium-sized Enterprises, issued by the Zhaoqing Municipal Bureau of Industry and Information Technology on August 17, states in its application conditions: applicant enterprises must be enterprises with digital transformation projects that have been completed. The benchmark award and subsidy standard is—the project investment cost after final verification should in principle be no less than RMB 1 million, and after transformation the digitalization level must reach Level 3 or above (according to the Ministry of Industry and Information Technology's Evaluation Indicators for the Digitalization Level of Small and Medium-sized Enterprises (2024 Edition)); a post-event subsidy of no more than 30% of the verified project investment cost (excluding tax) shall be granted, with a maximum of no more than RMB 800,000 for a single benchmark project.
The key lies in the next sentence: projects that have already received inclusive award subsidies in the earlier stage may apply additionally for benchmark projects, with the difference to be topped up according to the benchmark project award subsidy standards.
What this sentence means is that the benchmark step is not another separate payment of 800,000 yuan, but rather filling the gap. The general-benefit award/subsidy you have already received and the amount calculated according to the benchmark standard—only the difference between the two is what you can receive this time. There is an honest qualification here: the main text of the notice does not fully set out the calculation formula for the “difference,” nor does it give an example with numbers—the basis on which the general-benefit amount is converted, and whether the approved investment is consistent across the two applications, are not detailed in the original text. Therefore, the reconciliation approach I describe below is what we do when working on projects, not an officially given algorithm, and ultimately the review basis of the industry and information technology department shall prevail.
Before making up the difference, first align the basis of the two calculations
The act of making up the difference sounds like subtraction, but doing it is really a matter of definitions.
Here’s an example we used in an internal walkthrough; the numbers are hypothetical and only meant to illustrate the logic: Suppose a project has verified tax-exclusive investment of RMB 2 million. Thirty percent is RMB 600,000, which does not reach the RMB 800,000 cap. If it previously received RMB 300,000 under the inclusive standard, then the top-up is RMB 600,000 minus RMB 300,000, equal to RMB 300,000. But if the definition of “verified investment” changed between the two applications—for example, the inclusive application included the implementation service fee, while the benchmark application did not—then the base for the 30% is different, and the resulting difference is not this number.
The most common discrepancy here shows up in the systems. When we carry out digital transformation projects in enterprises, the investment details are scattered across several places: software procurement is on a contract and an invoice, equipment is calculated separately, implementation services are settled by person-day, and part of it is internal labor. In the financial accounts, these may have gone into different account categories, while the project ledger uses yet another set of definitions. When the same project has to be reviewed twice and the standards for the two reviews differ, the biggest fear is that “the number reported last time” and “the number that can be exported from the system this time” do not match.
Our approach is to create a working paper for each renovation project: every item of approved investment corresponds to a contract number, invoice number, payment voucher, and its classification in the system (fixed assets, intangible assets, or expenses). The two review tables must be traceable to the same set of original documents. This way, when making up the difference, the subtrahend is clear, not filled in arbitrarily.
There is another technical detail that is easy to overlook: the qualification threshold is “investment of no less than 1 million yuan and a digitalization level of Level 3 or above”; both conditions must be met. The digitalization level is reported by a third-party evaluation agency, not self-assessed by the enterprise—the notice explicitly states that “when an enterprise applies, it shall submit materials based on its self-assessed level, and the final result shall be based on the report issued by a third-party evaluation agency commissioned by the Municipal Bureau of Industry and Information Technology.” If it self-assesses Level 3 but is evaluated as Level 2, this application will be wasted.
Normalized window—don't comfort yourself with “the deadline has passed”
This notice also has another point that is very different from one-off applications: it clearly states “mature a batch, apply a batch, review a batch, and disburse a batch,” and establishes a regular application acceptance mechanism. Funds are reviewed and disbursed in the order of application and stop once exhausted; moreover, based on the budget scale and number of applications, the support ratio and amount may be appropriately adjusted within the maximum support standard.
Read this passage carefully, and you will know it is not “issued once in August and void after expiry.” It is a continuously open channel; it is just that each batch has specific material deadlines. The deadlines for this batch are: enterprises' paper materials should, in principle, be submitted to the local industry and information technology department before November 20—that is, today; after preliminary review by each county and district, they should be submitted to the city before November 25.
But I also have to be honest here. Today is the enterprise reporting day. If you are only seeing this article now, in most cases you will not make this batch. This judgment is based on the original wording of the notice: “late submissions will not be accepted.” So is this article still worth reading? I think it is, because this is a regular window—once you understand the difference make-up mechanism and the logic of aligning the two sets of standards, you can get the next batch of materials right in one go, instead of waiting for the notice to be issued and then going through the accounts from scratch.
Two other reminders. First, for projects that have already received inclusive support and have no new contracts or expenditures, to additionally apply for the benchmark, they only need to submit the benchmark application materials; they do not need to repeat the online application and can directly enter the benchmark award and subsidy review stage. If there are new expenditures, the new portion must be filled out in a separate set of materials according to the requirements for inclusive projects, and the inclusive and benchmark reviews will be combined. Second, the notice explicitly states, “No institution or individual has been entrusted to act as an agent for funding project applications, and accepting illegal service agents is strictly prohibited”—having someone else fill out the materials is itself crossing the line.
Three things you can do this week
First, determine which situation you fall into. The material requirements differ for the three situations: if you have already received inclusive finance support and have no new expenditures, submit only the benchmark materials; if you have already received inclusive finance support but have new contracts and expenditures, submit both sets; if you have never received inclusive finance support, submit the complete inclusive finance materials plus the benchmark materials. Once you have determined this clearly, then start preparing—don't do extra or leave anything out.
Second, recalculate the approved input once more and align the two calculation bases. Judgment condition: be able to list, item by item, the contracts, invoices, payment vouchers, and system attribution corresponding to the input. If the previous batch of inclusive application working papers are still available, use them directly for comparison; if the working papers cannot be found, export them from the financial system by project dimension. The goal is to make the "benchmark base" verifiable and the resulting difference explainable.
Third, confirm whether there is a third-party report for the digitalization level rating. Judging criterion: only a report issued by an evaluation institution showing that the level has reached Level 3 counts; self-assessment does not count. If you do not have one, first contact an evaluation provider, and at the same time pay attention to the submission timing for the next batch—the notice says applications are accepted on a regular basis, and the specific batch timing is determined by the local industry and information technology department, so you need to keep track of it yourself.
The hard part of making up a difference has never been the subtraction itself; it is that the numbers on both sides of the minus sign must be measured with the same ruler.
