Take the smaller of the invoice amount and the payment amount; Zhongshan also provided a three-year back-calculation this time.

The deadline is December 1, and 500 million is a tier threshold; what will really get an application form returned is how the equipment purchase amount is calculated and which date to count back from.

Set the completion date first, then work backward three years

Last week, a client in the equipment business came to ask with this notice from the Zhongshan Municipal Bureau of Industry and Information Technology, saying they wanted to apply for a batch of equipment for 2024, but their finance department could only reconcile the invoices; the payment was made in two installments, and they asked me which amount to fill in.

This question hits the nail on the head. The original text in the notice regarding the equipment time window is: The equipment declared for the reward (including relevant supporting systems) must be equipment purchased by the project unit during the period from the date of original project filing approval to the actual completion date, based on the invoice date, with a maximum duration of no more than 3 years, calculated backwards from the actual completion date.

I read this sentence three times, because its starting point for calculation runs counter to many people's intuition. Most policies calculate "forward from the filing date," while this one calculates "backward from the completion date." That is to say, you must first pin the project completion date within the interval from January 1 to December 31, 2024 (the notice requires the project to be completed within this interval, and the completion date to fall within the construction period on the filing certificate), and then count back three years from this completion date; only equipment invoices falling within the interval count. The filing approval date remains the lower limit—both ends must be satisfied, taking the intersection.

This is not wordplay. We once ran a similar interpretation for a client: for the same batch of invoices, calculating from the filing date versus working backward from the completion date, the amount eligible for the pool differed by 20%. Where does the difference lie? It lies in the portion that was already procured before filing but whose completion date is after filing. Whether it counts at all: the original text literally says “from the date of filing approval to the completion date,” so pre-filing amounts do not count—the three-year lookback only sets a maximum limit for this interval; it is not meant to let you bypass the filing date. Here is an honest qualification: the document does not give examples clarifying how to recognize boundary cases such as “procured before filing, delivered after filing.” We interpret it literally, and the final determination shall be subject to the review criteria of the industry and information technology department.

Between the invoice amount and the payment amount, take the smaller one

The second sentence that is easily skipped is in the funding criteria: when calculating the purchase amount of project equipment and systems, follow the principle of using the smaller of the invoice amount and the payment amount during the project construction period.

Finance colleagues will say when they see this: aren't invoices and payments the same thing? In the projects we've worked on, most of the time they aren't. A 1.2 million equipment invoice may only be paid 1.08 million because warranty retention is withheld; or a 600,000 advance may be paid first while the invoice hasn't been fully issued. Contract amount, invoice amount (which also has tax-inclusive and tax-exclusive distinctions), and payment amount belong to three different tables in Odoo: purchase invoices are account.move, payments are account.payment, and what enters fixed assets is account.asset. The amounts of the three are naturally inconsistent; this is not a data error, but simply how the business is.

The “smaller amount” rule means that the figure on your application form must be the smallest among these figures and must fall within the construction period. Note that the notice also clarifies that equipment “includes related supporting systems”—the control system and bundled software that come with purchased equipment can be counted, but they must reconcile on the same invoice or corresponding payment voucher. The pitfall we have encountered is this: the hardware was invoiced, while implementation services were under a separate contract and separately invoiced; at the time of application, we wanted to combine them for inclusion, but it turned out that one invoice’s period fell within the construction period and the other outside it. Once the “smaller amount” criterion kicked in, the portion outside the period was directly disqualified.

So the preparatory work before application is not to copy a total figure from finance, but to pull together a detailed schedule: for each piece of equipment/system, the invoice number, invoice date, invoice amount (stating the tax-inclusive basis), corresponding payment date and payment amount, whether it is included in fixed assets, and the card number or system name. The fields in this schedule are exactly what Notice Annex 8, the "Project Equipment Purchase Detail Schedule," calls for—although the specific columns of this annex were not analyzed item by item in this round, inferring backward from the application rules, at least these dimensions are unavoidable. Once this schedule is made, the special audit report will also have ready-made working papers, because the notice requires that a third party must be commissioned to issue a special audit.

The 500 million line determines 15% or 10%

Having covered the criteria, now for the money. Zhongshan's reward this time is given after the fact, and the tiers are spelled out very clearly:

For major technological transformation projects with an actual total investment of RMB 500 million or more, a reward of no more than 15% of the total amount of newly purchased equipment and systems shall be granted, with a maximum of RMB 10 million per project; for those below RMB 500 million, no more than 10%, with a maximum of RMB 6 million. In addition, for projects included in key-supported manufacturing digital and intelligent transformation and upgrading breakthrough projects, or selected as “AI + Manufacturing” demonstration application projects, the above standards shall be additionally increased by no more than 50%, but funding for a single project shall not exceed 15%, with a maximum of RMB 10 million.

These sentences need to be calculated together. For a project of 500 million or less, the base tier is 10%; if it is a digital and intelligent critical project, it is additionally increased by no more than 50%—10% multiplied by 1.5 is 15%, exactly hitting the "no more than 15%" ceiling. Therefore, for projects of 500 million or less, this bonus has real substantive significance; for projects of 500 million or more that are already at 15%, applying the "additional 50%" multiplier would long exceed the cap, and in practice it is still 15%. Don't see "additional 50%" and think you can get 22.5%; the phrase "no more than 15%" in the document is a hard constraint.

There is one more number to keep in mind: the project's planned total investment must be no less than 5 million yuan and must be included in the statistics for technological transformation investment. 5 million is the threshold, 500 million is the tier cutoff—don't confuse the two numbers. In addition, each project entity may apply for at most one project, and the same project cannot be submitted through multiple channels for the portion that has already received other special funds.

Let me add my own judgment here: this notice was posted as early as November 10, and as of today it has been ten days. It belongs to an existing window, not a new policy that just emerged yesterday. The reason it is being raised again this round is that the system will close at 18:00 on December 1, and two copies of the paper materials must also be submitted to the town/subdistrict before then—this is something that must be acted on this week. After the initial review by the town/subdistrict, it must then be submitted to the city by December 4.

Three things you can do this week

First, pin down the completion date to determine eligibility. Criteria: the project completion date is between January 1 and December 31, 2024, and falls within the construction period stated on the filing certificate. If this condition is not met, no further calculation is needed. If it is met, draw a three-year line backward from the completion date, take the intersection with the filing date, and only invoices falling within that interval enter the pool.

Second, pull the equipment detail list and recalculate it using the “start from the smallest” approach. Judgment criteria: be able to list the invoiced amount, payment amount, purchase date, and name of the supporting system one by one against the invoice number. For any invoice whose payment is less than the invoice amount, fill it in according to the payment; for any invoice whose date falls outside the interval, list it separately and do not force it in. This table is also the working paper for the special audit.

Third, complete the system filing and paper submission by December 1. Judgment conditions: whether the project's total investment has exceeded 5 million, whether it has hit the 500 million tier threshold, and whether it is a digital and intelligent critical breakthrough or an AI+ manufacturing demonstration project—these three questions determine whether you fill in 10% or 15%, and whether you report an upper limit of 6 million or 10 million. The system closes at 18:00 on December 1; late submissions will not be accepted.

To be honest, the most time-consuming part isn't filling out the forms, but aligning the basis for the amounts across the three tables. If this is put off until the end of November, there won't be enough time for the special audit.

关于我们

​我们致力于帮助中小企业实现数字化转型,我们的团队由一群充满激情和创新思维的专业人士组成,他们具备丰富的行业经验和技术专长。

扫一扫获取顾问以及手册

Sign in to leave a comment
The application form says "version number"; don't just fill in "used HarmonyOS".
Guangzhou's "HarmonyOS+" call for submissions offers no prize money; what it gets you into is the benchmark reserve pool; the two hard fields in the two columns determine whether you need to go through your equipment ledger right now.